보고 / BMTA Maintainers Report
jhp
2008.10.07 12:50
1,081
0
-
- 첨부파일@@ : 78e69878_BMTAMaintainersReport_1008.docx (15byte) - 다운로드
본문
BMTA Section Maintainers Report
To submit by email: Copy this form and paste into a Word file. Then, fill-out the form,
save as a Word document, and email the saved, filled-out form as an attachment to your
Maintenance Director.
To submit by mail: Print, fill out and send by U. S. Mail to your Maintenance Director.
Please try to submit a report within one week of your work trip.
Reported By Jaehee Park Work Trip Date 10/05/08 Section 2b
Report hours to the nearest half-hour. Travel hours are those you spent in a vehicle.
NAMES OF PEOPLE TRAIL WORK ROUND TRIP TOTAL
WORKING HOURS TRAVEL HRS HOURS
MEMBER / GUEST
Hyokun Chang Member 7 5 12
Chisung Noh Member 7 5 12
Youngkil Chang Member 7 5 12
Jungmin Park Guest 7 5 12
Jaemoon Sim Guest 7 5 12
DESCRIPTION OF WORK DONE: (Check or list quantity)
Blazes painted x Water diversions cleaned: 4 spots
x Vegetation cleared from R/W: 3 miles Blow downs removed
Tread reshaped/restored Water diversions installed
Other work done: In the beginning area of the Section 2b (just past No Name Gap),
where we had worked for waterbar installation in August, we cleaned waterbars and
drainage ditches. And we cleared vegetation for the whole range of Section 2b.
ADDITIONAL WORK NEEDED: (Say where, if possible)
Clear vegetation:
Remove blow downs: We have seen a blow down in the halfway of Section 2c
(Bryson Gap – Tocoa River), which blocked the trail.
Side hill to reshape tread:
Clean or build water diversions:
Paint or repaint blazes:
Add or replace signs:
Other notes:
Does this section need a Saturday work trip? Yes
Why? We need some sidehill work about a quarter mile before the Bryson Gap
from South.
Thank you for maintaining the Benton MacKaye Trail in a condition we can all be
proud of.
To submit by email: Copy this form and paste into a Word file. Then, fill-out the form,
save as a Word document, and email the saved, filled-out form as an attachment to your
Maintenance Director.
To submit by mail: Print, fill out and send by U. S. Mail to your Maintenance Director.
Please try to submit a report within one week of your work trip.
Reported By Jaehee Park Work Trip Date 10/05/08 Section 2b
Report hours to the nearest half-hour. Travel hours are those you spent in a vehicle.
NAMES OF PEOPLE TRAIL WORK ROUND TRIP TOTAL
WORKING HOURS TRAVEL HRS HOURS
MEMBER / GUEST
Hyokun Chang Member 7 5 12
Chisung Noh Member 7 5 12
Youngkil Chang Member 7 5 12
Jungmin Park Guest 7 5 12
Jaemoon Sim Guest 7 5 12
DESCRIPTION OF WORK DONE: (Check or list quantity)
Blazes painted x Water diversions cleaned: 4 spots
x Vegetation cleared from R/W: 3 miles Blow downs removed
Tread reshaped/restored Water diversions installed
Other work done: In the beginning area of the Section 2b (just past No Name Gap),
where we had worked for waterbar installation in August, we cleaned waterbars and
drainage ditches. And we cleared vegetation for the whole range of Section 2b.
ADDITIONAL WORK NEEDED: (Say where, if possible)
Clear vegetation:
Remove blow downs: We have seen a blow down in the halfway of Section 2c
(Bryson Gap – Tocoa River), which blocked the trail.
Side hill to reshape tread:
Clean or build water diversions:
Paint or repaint blazes:
Add or replace signs:
Other notes:
Does this section need a Saturday work trip? Yes
Why? We need some sidehill work about a quarter mile before the Bryson Gap
from South.
Thank you for maintaining the Benton MacKaye Trail in a condition we can all be
proud of.
댓글목록 0